, , , , , , ,

FM2026-06 Nitrogen Soldering Iron (Conversion Kit)

SKU: HFM2026-06

Hakko
Availability:

Available for order*


FM2026 Nitrogen Soldering Iron Conversion Kit
Used together with HAKKO FM-202, FM-203, FM-204, FM-205, FX-950, FX-951 and FX-952
Requires Nitrogen Source

£206.52 Excl. VAT

Available for order*

A minimum sub total of £250.00 is required, You need an additional £250.00 to proceed through to the checkout.

For customers in the Republic of Ireland, please contact us for a quote including shipping and customs charges.

Request quote

Note: Tips not included. Requires Nitrogen Source to function.

Conversion Kit :

Can be used in combination with your existing soldering station, the HAKKO FM-202, HAKKO FM-203, HAKKO FM-204, HAKKO FM-206,HAKKO FX-950, HAKKO FX-951, or with HAKKO FX-952.

The N2 gas and preheating effect have achieved significant improvement in soldering work!

N2 soldering iron providing 70W high output

Preheating effect
The hot N2 gas is effective for preheating.

Oxidation prevention

Nitrogen Generators sold separately:

N2 System
Can be used in combination with the HAKKO FX-780 and HAKKO FX-791 to create an N2 System.

Model No.

FM2026-02

FM2026-03

FM2026-04

Power consumption

70W (24V)

Temperature range

200 to 450°C

Tip to ground resistance

<2

Tip to ground potential

<2mV

Heating element

Composite heater

Cord length

1.2m

Total length

205mm (with 2.4D tip)

Weight

45g (with 2.4D tip and nozzle assembly C)

* Total length and weight (w/o cord, tube)
* Do not set the temperature over 400°C.

You may also like…


Thank you for visiting the only authorised wholesaler of Hakko products in the UK and Ireland. Please note: we have a minimum order value of £250 excluding shipping. Orders under this value will not be processed at checkout.

************************************************************************************************************

Easter Closure, 2025: Friday 18th April to Monday 21st April, 2025.
Orders placed after 12 noon on Thursday 17th April will be processed on Tuesday 22nd April at the earliest.
We apologise in advance for any inconvenience this may cause. Thank you for your cooperation.


************************************************************************************************************

Dismiss